Posted by davie_a at 9:50 AM on October 14, 2016
Damage to Parapet Wall
Following the damage sustained to Calder Bridge parapet wall by a heavy vehicle, the parapet wall will be made safe by Renfrewshire Council and then they will programme their term contractor to commence the repair work once Lochwinnoch Bridge is reopened to traffic.
Sign In to Edit this Site ©2019 Designed & Hosted by Scotland 2000